Info

/

/

/

/

/

/

/

/

/

/

y

/

(b)

If planners do not assume that all of the excavated soil comes from the landfill excavation, then their solution must incorporate the annual in-place waste and soil volume, the excavated landfill volume, the aboveground landfill volume, and the cover-soil-to-waste ratio. Excavation side slopes are often assumed to be 1:1 but may be more gradual. Excavation bottom slopes are slight and can be assumed level for the purpose of initial size estimates.

Project Earth Conservation

Project Earth Conservation

Get All The Support And Guidance You Need To Be A Success At Helping Save The Earth. This Book Is One Of The Most Valuable Resources In The World When It Comes To How To Recycle to Create a Better Future for Our Children.

Get My Free Ebook


Post a comment