Info

25 ¡g/L

(C)

Source: U.S. Environmental Protection Agency, 1977, Toxic pollutant effluent standards, Code of Federal Regulations, Title 40, part 129 (Washington, D.C.: U.S. Government Printing Office).

Source: U.S. Environmental Protection Agency, 1977, Toxic pollutant effluent standards, Code of Federal Regulations, Title 40, part 129 (Washington, D.C.: U.S. Government Printing Office).

(A) An average per working day, calculated over any calendar month.

(B) Monthly average daily loading per quantity of pollutant produced.

(C) A sample(s) representing any working day.

porting. These BMPs can be applied to a variety of industrial facilities and are considered to be source reduction practices. These BMPs eliminate or reduce the pollutant generation at the source.

The next best BMP options include reuse or recycling of storm water in the industrial processes, followed by runoff management controls, such as vegetative swales and infiltration devices. Finally, if none of these applications control the storm water pollutants, regulators should explore treatment options. Treatment options include engineered systems, such as oil-water separators, sedimentation tanks, and metal precipitation systems, depending on the pollutants to be removed.

Project Earth Conservation

Project Earth Conservation

Get All The Support And Guidance You Need To Be A Success At Helping Save The Earth. This Book Is One Of The Most Valuable Resources In The World When It Comes To How To Recycle to Create a Better Future for Our Children.

Get My Free Ebook


Post a comment