Effluent Quality

Activated-sludge process design is based on the desired effluent quality. Successful operation of the activated-sludge process with an F/M ratio of 0.35 lb BOD5 per lb MLSS per day and efficient liquid-solids separation should yield effluent containing an average of 20 mg/l of SS and 20 mg/l of BOD5. For municipal wastewater, activated-sludge treatment removes the following major pollutants in the percentages listed:

90+% BOD5 (biological oxygen demand) 70+% COD (chemical oxygen demand) 90+% SS (suspended solids) 30+% P (phosphorus) 35% N (nitrogen)

represents a large initial capital outlay, with high operation and maintenance costs. Treatment associated with most activated-sludge treatment plants includes primary clarification, sludge handling, and chlorination. Table 7.25.3 shows an estimated cost breakdown for the total activated-sludge treatment facility for plants varying in size from 1 to 100 mgd. The table shows the approximate cost distribution in such a facility together with the approximate cost for various plant sizes and each phase of the total treatment facility.

Trash Cash Machine

Trash Cash Machine

How recyclable trash can save the world and bank us huge profits! Get All The Support And Guidance You Need To Be A Success At Recycling! This Book Is One Of The Most Valuable Resources In The World When It Comes To How To Make Profits With Trash!

Get My Free Ebook


Post a comment