6,100 6,300 6,500 6,700 Operation time [h] Fig.6 Results of load perturbation test (weekly load perturbation)

Fig.7 Results of load perturbation test (daily load perturbation)

Optimizing the stack design by these results of the short stack study, 500kW stack have been made and started to demonstrating operation since this year.