M

magnetic ballasts 360 maintainability 211 maintenance 42, 424, 503 actions 416

for air compressors 407 manual 347 of the lighting 405 procedures 413 program 401

schedule 411 management control systems 7 management decisions 423 manifold 478 manometer 428 manual override 321, 346 Markey Bill 294

MARR (minimum attractive rate of return) 668 mass flow rate 202, 449 mass resistances 438 materials and construction 209 materials handling energy savings 432

materials handling maintenance 421 maximum theoretical COP 198 MCS (multiple-chemical-sensitivity)

497, 499 mean light output 399 mean temperature 440, 449, 450 mean time between failure 631 measurement and verification

(M&V) 707, 711 measuring instruments 426 mechanical equipment 748 mercury vapor 359

lamp 399 metallic radiation recuperator 211 metal building roofs 232 metal building walls 228 metal elements envelope 225 metal halide 359, 399 microturbines 170 mineral Fiber/Rock Wool 441 miniature data loggers 25 minimum annual cost analysis 465 minimum attractive rate of return

(MARR) 43, 54 minimum on-minimum off times 320

model energy code 541 Model Energy Codes 540 modified accelerated cost recovery system (MACRS) 45 modulation 579, 618 molten carbonate fuel cell (MCFC) 170

monitoring 346, 431 Montreal protocol 543 most-open valve 618 motor-generator sets 300 motor 407

code letters 275 efficiency 284, 294 manager 294 operating loads 281, 282 performance management process 294 record form 295, 296 rpm 290

speed control 321 multimeters 427 multizone systems 253 mutually exclusive 59, 60 set 60

0 0

Post a comment