Hot Water Boiler Control

Where there are multiple boilers in a set the software shall change the lead-lag status of boilers 1 and 2 in the set on a biweekly basis (Note the call to the lead-lag algorithm). This specific algorithm calls the general CENTHEAT algorithm which assumes that the heating circulation pump is stage one of the central heating plant.

For the following control points CONTRACTOR shall apply this HOT WATER BOILER CONTROL algorithm:

1. Boiler 1

2. Boiler 2

VARIABLE DEFINITION:

0 0

Post a comment