12a10 General

12.A1.1 The listings in this section are meant to provide a logical guide for the sequence of operations to be used for each point of control. There are many considerations other than those listed in this section which must be incorporated into a proper energy management system control program.

12.A1.2 CONTRACTOR must provide programs in the language that is appropriate for the hardware that is used. The programs written in the primary language of the controller must conform in operation and functionality to the sequences listed in these specifications. CONTRACTOR IS LIABLE FOR PROOF OF COMPLIANCE WITH THESE SPECIFICATIONS. BASIS FOR PROOF OF COMPLIANCE WILL BE COMPARING CONTRACTOR'S WRITTEN PROGRAM CODE WITH THE SEQUENCES PROVIDED IN THESE SPECIFICATIONS AND FIELD TESTING OF ACTUAL SYSTEM OPERATION. EACH CONTROL POINT IN THE SYSTEM MUST BE EXERCISED IN THE PRESENCE OF OWNER'S REPRESENTATIVE TO PROVE PROPER OPERATION.