Info

Originator

Ext.

Approved By:

Total Budget (US)

FIGURE 3 Example of a requisition format

FIGURE 3 Example of a requisition format the purchaser) is responsible for the actual equipment design. If design requirements rather than performance requirements are specified, the vendor may claim that he is not responsible when performance requirements are not met. Care must be taken to assure that the equipment selected is from qualified vendors with proven design experience in similar applications. The purchaser must resist the temptation to force the vendor to modify a proven design and build a pump with which the vendor does not have proven experience.

As a minimum, a technical specification must list the following:

Requisition Number

Rev. No.

End of Days Apocalypse

End of Days Apocalypse

This work on 2012 will attempt to note them allfrom the concepts andinvolvement by the authors of the Bible and its interpreters and theprophecies depicted in both the Hopi petroglyphs and the Mayan calendarto the prophetic uttering of such psychics, mediums, and prophets asNostradamus, Madame Blavatsky, Edgar Cayce, and Jean Dixon.

Get My Free Ebook


Post a comment